A725 NB between Bellziehill Jct & North Alderston Bridge (James St Bellshill)
30 October 2026
One Overnight Carriageway Closure of A725 northbound between Bellziehill Junction & A725 North Alderston Bridge at James Street, Bellshill, for installation of additional central barrier protection
Road users are advised that the A725 northbound carriageway between Bellziehill Junction and North Alderston Bridge, James Street, Bellshill, will be subject to one overnight closure commencing at 8pm on Friday 30 October 2026. These works are to install additional barrier for site protection and asset protection. We are removing the vehicle restraint system (VRS) in the median on both sides of the structure to construct a new VRS system for pier protection to the bridge.
The works will take place as follows:
One overnight closure of the A725 northbound carriageway between Bellziehill Junction & North Alderston Bridge, James Street, Bellshill
The A725 northbound carriageways between Bellziehill Junction on slip road and North Alderston Bridge, James Street, Bellshill will be closed for one overnight, from 8pm to 6am the following day:
- Friday 30 October 2026 (one overnight)
As a result, the following slip roads will also be closed:
- A725 northbound Bellziehill Junction on slip road;
- A725 northbound North Alderston Bridge (James Street Bellshill) off slip road;
- A725 northbound Strathclyde Business Park off slip road;
Signed Diversion Routes will be in place as follows:
Diversion Route 1: A725 northbound traffic for access to Coatbridge (A8) & (M8): Leave A725 northbound at off slip for Bellziehill roundabout, take 4th exit for A721 Gartcosh Walk, A7070 North Road, return to A725 northbound and follow permanent signage for Coatbridge, A8 and access to Edinburgh (M8).
Diversion Route 2: A725 northbound traffic for Righead Industrial Estate/ Strathclyde Business Park (Hilton Hotel): Leave A725 northbound at off slip for Bellziehill roundabout, take 2nd exit for B7001 Old Edinburgh Road, Melford Road for Righead Industrial Estate or continue to James Street, Swift way and Phoenix Crescent for Strathclyde Business Park.
Local diversion signage will also be in place.
These closures are required to ensure road users and road worker safety for construction of additional centre barrier and pier protection to the bridge. The overnight closure of the A725 northbound carriageway for one night is to minimise disruption to traffic as much as possible.
The main diversion route will add an estimated 0.75 miles and 5 minutes to affected journeys via the A721 Gartcosh Walk and B7070 North Road, Bellshill, back to A725 at Shawhead Junction.
There will be ‘No Access’ for emergency vehicles as the two lane carriageway will be in use, with Hi-Ab Cranes installing central barrier protection.
Road users are encouraged to plan ahead and check Traffic Scotland’s website prior to travelling to check their route.
The works will be carried out by Scottish Road Partnership on behalf of Transport Scotland to maintain the integrity and safety of this route. The works have been planned in consultation with Transport Scotland, North Lanarkshire Council and the emergency services.
Please note, all works are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.
If you have any enquiries regarding these works, please contact us on 0800 042 0188 or info@scotroadspartnership.co.uk.
Real-time journey information can be obtained by visiting www.traffic.gov.scot or via Twitter: @TrafficScotland
Ends.